So to me 4 weeks is a month.
If a biweekly skips. That’s one mow a month.
The timeline of 30 days for the long grass fee needs to be dropped to 22 days. If a biweekly pushes back one week. Ok fine. No long grass fee. If they push back 2 weeks. Then yeah. Hit them with that flex
Just saying. That would be a hole lot better than the system you got now.